Budgeting Subcontracts
For budgeting purposes, the
subcontract (or subgrant) should be identified in the proposal
budget as a separate line item. The item should be noted and a
cost breakdown for the subcontract should be referenced as an
attachment to the main proposal budget. The subcontract budget
should reflect all appropriate direct and indirect (F&A)
costs. (Educational institutions should include F&A costs at
their current federally negotiated rates.) Subcontract budgets
must be approved by appropriate officials of the proposed
subcontractors–preferably BEFORE the proposal is submitted.
NOTE:
- the first $25,000 of EACH
subcontract in your proposed budget will be included in the
MTDC base used for calculating F&A cost.
- this University will not limit the
F&A recovery by the subcontractor unless required to do so
by the agency (which most will not do).
|